


More than concrete placement
Strong concrete begins with proper preparation
The strength of the mix is only part of the story. Ground, support, reinforcement, formwork, placement, curing and exposure decide how long concrete lasts. We plan the whole sequence — excavation, preparation, steel, forms, pour, waterproofing — and follow the engineer's plans where required.
We understand what supports the concrete —
not just how to pour it.
Stairs, foundations & slabs
Our concrete services
We don't simply replace the concrete. We address the conditions beneath it.
Pyrite Removal & Slab Replacement
A new slab is only as good as the ground beneath it.
Slab demolished, pyrite-bearing fill removed where testing confirms it, clean backfill compacted, vapor barrier and a new slab.
Read more →Pyrite Testing
Know before you demolish.
Core samples from the slab and fill, analysed by a laboratory — the slab is replaced only if the results confirm it.
Read more →Formwork, steel & climate
Precision before placement
Montreal concrete freezes and thaws dozens of times a winter, often wet and salted. The right mix, drainage, finishing and curing decide whether stairs and exterior work last.
Concrete must be built for the environment it will perform in.
- Accurate formwork — the geometry before the pour
- Reinforcing steel placed to the plans
- Mix chosen for the use and freeze-thaw exposure
- Proper placement and finishing
- Curing that lets concrete reach its strength
- Waterproofing and drainage where required
Concrete + waterproofing
Coordinated from the beginning
New foundation walls need waterproofing and a French drain; a new slab may need a vapor barrier or groundwater control. As waterproofing specialists, we plan it with the concrete. Foundation waterproofing →
Our approach
Assessment. Preparation. Reinforcement. Placement. Completion.
- 01Assessment & planningStructure, site, access and engineering requirements.
- 02ProtectionLandscaping, walkways, neighbours — and interior areas for slab work.
- 03Demolition & excavationOld structures and unsuitable material removed.
- 04Ground, forms & steelSupport prepared, forms built, reinforcement placed.
- 05Pour, finish & curePlaced, finished and protected while it cures.
- 06Waterproofing & cleanupDrainage and protection where required; final review.
On the job site
Recent concrete projects
Why Delta
Why choose Delta Waterproofing
Concrete construction cost in Montreal
The structure and its size, the site, excavation and demolition, soil preparation, engineering, formwork, reinforcement, concrete volume, access, waterproofing and disposal. A free on-site assessment gives you a written, project-specific quote.
Get the priceDo you replace exterior concrete stairs?
Yes — demolition, support, formwork, reinforcement and a new pour.
Can you build the foundation for my house extension?
Yes, to the engineer's plans — including waterproofing and drainage.
What is pyrite damage?
Pyrite in some crushed-stone fill reacts with moisture and air and swells, lifting and cracking the slab above.
Does every cracked basement floor have pyrite?
No. Shrinkage, settlement and loads also crack floors. Testing confirms pyrite.
Can a slab be replaced without removing the pyrite?
If pyrite fill is confirmed, a new slab on the same fill leaves the problem underneath.
Do you install a vapor barrier under new slabs?
Yes, where specified.
Can concrete be poured in winter?
Some work, yes — with the right mix, heating, protection and curing.
Free on-site estimate
Planning concrete work?
Send us photos of the stairs, the slab or your extension plans — or book a free on-site assessment. A specialist answers within one business day.
RBQ 5762-6723-01 · $5M liability insurance







